C.2 Conversion Procedure
• Select each KFMSA module in each system.
• Run EVCXE or EVCXF.
• Modify certain parameters in the disk ISEs.
• Make sure that all modified parameters are recorded as permanent values.
• Verify the communication path with all ISEs on the DSSI buses.
After all of the above have been accomplished successfully, return the systems
and the Sx300 storage array to normal operating mode.
C.2.7 Final Verification
Now that the Sx300 conversion, cabling and labeling, and the powering up
steps are complete, you are ready to configure the DSSI subsystem and verify
the correct operation of each ISE in the array with the host system.
Refer to the KFMSA Module Installation and User Manual (EK–KFMSA–
IM), Magazine Tape Subsystem Service Manual, and the Integrated Storage
Element User Guide for detailed information and how to proceed with verifying
the correct operation of each ISE that has been installed. In these manuals,
you will find the procedure for establishing the communications between the
ISEs, the adapter module, and the system. You will also find the step-by-step
procedures for reconfiguring the system with its newly installed DSSI devices.
Refer to the manuals for the disk ISE and tape ISE for detailed information on
the local programs in the ISEs.
Remember, each Sx72 enclosure can contain two or four disk ISEs. Each
magazine tape subsystem contains one tape ISE. A fully configured storage
array contains 24 disk ISEs and 2 tape ISEs.
Converting a Single-Host Configuration to a Dual-Host Configuration C–19